Precast Concrete Plant

PHC slabs W:25 cm

Stressing wires  –  W 6.35 mm

Stressing  strands  –  T 1/2”, T3/8”

Own weight
328 kg/m²
393 kg/m²

Geometric data and positioning of stressing strands

Positioning of stressing strands – fire resistance 120 min.
Positioning of stressing strands – fire resistance 120 min.
Type of PHC slab Distance from the bottom in cm
h h 22.0
4.5 4.5
25066 6T 3/8” 2W 6.35
25086 8T 3/8” 2W 6.35
25106 10T 3/8” 2W 6.35
25088 8T 1/2” 2W 6.35
25088026 8T 1/2” 2T 3/8” 2W 6.35
Geometric data
Geometric data
Composite w/5 Cm topping Precast
2114 1634 A(cm2)
210083 124214 I(cm4)
14.19 12.62 Y*(cm)
15.81 12.38 Yb(cm)
32 32 bw(cm)
9588 6565 Sx(cm3)

Useful loads table

 

 

Cross Section’s Ultimate Resistance
Cross
section’s
ultimate
resistance
tm/m 9.68 12.55 15.3 22.22 24.85
Type PHC slab 25066 25086 25106 25088 25088026
Key 450 2010 2310 2420
475 1770 2170 2280 2490
500 1560 2040 2140 2340 2410
525 1380 1900 2020 2210 2280
550 1220 1700 1910 2100 2160
575 1090 1520 1810 1990 2050
600 970 1370 1720 1890 1950
625 860 1230 1580 1800 1860
650 770 1110 1430 1720 1770
675 690 1000 1300 1640 1690
700 610 900 1180 1570 1620
725 540 820 1080 1500 1550
750 480 740 980 1440 1490
775 430 670 900 1380 1430
800 380 600 820 1330 1370
825 330 540 750 1240 1320
850 290 490 680 1130 1270
875 260 440 620 1040 1190
900 220 400 570 950 1090
925 180 350 520 870 1010
950 310 460 800 930
975 260 410 730 850
1000 220 360 670 790
1025 180 320 610 720
1050 150 280 550 660
1075 240 500 610
1100 200 460 560 550
1125 170 410 510 480
1150 370 350 460 410
1175 330 290 420 350
1200 300 240 380 300
1225 260 200 340 250
1250 230 160 310 210
1275 180 280 170
1300 250
1325 180
1350
1375
1400

 

 

 

Notes:

  1. The loads specified in the table consist of a constant 150 kg/m2 load + usage load
  2. The load specified in the table is the load beyond the PHC slab’s own weight and that of the complementary casting
  3. In the table, loads that are not in bold refer to PHC slabs whose total sinking from the topping date to the end of the crawl and contraction process is less than 350/L.
  4. The loads in bold refer to PHC slabs whose deflection from support level is less than 250/L
  5. Loads that are left of a thick line are based on the slabs’ shear strength

 

Contact for more information