Precast Concrete Plant

PHC slabs W:20 cm

Stressing wires  –  W 6.35 mm

Stressing  strands  –  T 1/2”, T3/8”

Own weight
273 kg/m²
327 kg/m²

 

Geometric data and positioning of stressing strands

Positioning of the stressing strands – fire resistance: 120 min.
Positioning of the stressing strands – fire resistance: 120 min.
type of PHC slab distance from bottom in cm
h h 17.0
4.5 4.5
20076 7T 3/8” 2W 6.35
2018066 6T 3/8” 1T 1/2” 2W 6.35
2028056 5T 3/8” 2T 1/2” 2W 6.35
2038046 4T 3/8” 3T 1/2” 2W 6.35
2048036 3T 3/8” 4T 1/2” 2W 6.35
2058026 2T 3/8” 5T 1/2” 2W 6.36
Geometric data
Geometric data
Composite w/5 cm topping Precast
1843 1363 A (cm2)
122416 65318 I (cm4)
11.80 10.07 Y* (cm)
13.20 9.93 Yb (cm)
30 30 bw (cm)
6773 4350 Sx (cm3)

Useful loads table

 

 

Cross Section’s Ultimate Resistance
Cross section’s ultimate resistance tm/m 8.88 10.20 11.13 12.04 12.95 13.80
Type PHC slab 20076T 2018066T 2028056T 2038046T 2048036T 2058026T
Key 350 2290 2340 2390 2440 2490
375 2110 2160 2210 2260 2300 2340
400 1960 2010 2050 2090 2130 2170
425 1820 1870 1910 1950 1990 2020
450 1700 1740 1780 1820 1860 1890
475 1590 1630 1670 1710 1740 1770
500 1430 1530 1570 1600 1640 1670
525 1260 1440 1480 1510 1540 1570
550 1120 1340 1400 1430 1460 1480
575 990 1190 1320 1350 1380 1400
600 880 1070 1190 1280 1310 1330
600 880 1070 1190 1280 1310 1330
625 790 940 1050 1160 1240 1260
650 700 820 930 1030 1140 1200
675 620 720 820 920 1010 1100
700 530 630 720 810 900 990
725 460 550 640 720 800 880
750 390 480 560 630 710 790
775 330 410 480 560 630 700
800 270 350 420 490 560 620
825 220 290 360 430 490 550
850 180 240 310 370 430 490
875 200 260 320 370 430
900 150 210 270 320 370
925 170 220 270 320 270
950 180 230 280 230
975 190 240 220
1000 190 170
1025
1050
1075
1100
1125
1150
1175
1200
1225

 

Notes:

  1. The loads specified in the table consist of a constant 150 kg/m2 load + usage load
  2. The load specified in the table is the load beyond the PHC slab’s own weight and that of the complementary casting
  3. In the table, loads that are not in bold refer to PHC slabs whose total sinking from the topping date to the end of the crawl and contraction process is less than 350/L.
  4. The loads in bold refer to PHC slabs whose deflection from support level is less than 250/L
  5. Loads that are left of a thick line are based on the slabs’ shear strength

 

Contact for more information